SAAP 2016-20 ELURU

Name of the Project
Providing Sewerage network and Construction of 5MLD STP for Zone-IV and Septage Management remaining Area of Eluru Municipal Corporation
Name of the Agency
M/s NCC Ltd., Hyderabad; Mr.V.VINAY KUMAR-Je .GM-Cell No;-9866352070(Mail Id: vinayavysyaraju@gma )
SAAP Approval Meeting No. & Date by SHPSC SAAP Approved Cost
(In Cr.)
Technical Approval Date of DPR by SLTC Administrative Approval of DPR by SHPSC NIT Approved Administrative Sanction Cost (In Cr.)
27.55 08/05/2017 10/05/2017 26/09/2017
Tender Floated On Last Date of receipt of Tender Tender Type IBM / ECV Value % of Tender
Yes 28/10/2017 EPC 34.53 4.650
Contract Awarded Cost
(In Cr.)
Contract Awarded On Contract Period (Months) Completion Date Remarks
36.14 20/12/2017 15 19/03/2019 As on date Status:26-11-2018:- STP - Soil Investigations and (Dated:10.01.2018) in Eluru town at STP location.. UGD-Survey works & STP site cleaning work had done. EPC-Design work under progress, Bhoomi pooja completed ( 25.04.2018 ) By MLA,MP & MUNICIPAL MYAIOR, 1).Admin Building columns casting up to Plinth beam bottom was completed. And BACK FILLING is going on. 2)SBR-PCC for Raft and Base slab concrete completed ..********* 3)SBR-SS Pump pit raft concrete(M30) was done (27.06.2018 )******* 3A) MANHOLE-COVERS-QAP-INSPECTION at Guntur. along with PHED-Dy.EE,QC- was done .(05-07-2018 )******* 4)SBR-W1 wall wes side raft concrete (M30 ) was completed (13-07-2018 ).****** 5)GUARD ROOM Roof slab casting completed. Brick work under progress** 6)SBR-W2 wall wall wes side raft concrete (M30 ) was completed (23-07-2018 ).****** 7)SBR-W1 wall wall east side raft concrete completed (03-08-2018) ***** 8) Admin Building plinth Beam completed (03-08-2018 )******** 9)SBR-W1 wall steel reinforcement is under progress ***** 10) Admin Building columns 1st lift above plinth beam have done (Dated:-08-08-2018 )***** 11) Admin Building columns 2nd lift above plinth beam have done (Dated:-10-08-2018 )***** 11) Admin Building columns 3rd lift above plinth beam have done (Dated:-14-08-2018 )***** 12)SBR-W1 wall wall wes side WALL concrete (M30 ) 1st lift was completed (25-08-2018 ).****** 13)Admin building rSBR-W1 oof slab concrete done (29-08-2018)******* 14)SBR-W1 wall wall west side WALL concrete (M30 ) 2nd lift was completed (03-09-2018 )***** 15)SBR-W1 wall wall east side WALL concrete (M30 ) 1st lift was completed (07-09-2018 )***** 16)wall wall west side WALL concrete (M30 ) 3rd lift was completed (10-09-2018 )***** B)ELUR -SAAP-16-20-5MLD STP. and UGD NP3 VRCC -pipes Inspection done today (12-09-2018) along with PHED-AE, PHED/QC -AE- and Dy. EE at Jaya Hume pipes Guntur. &&&&& 18) SBR-wall steel reinforcement & shuttering work under progress =============== 19)SBR-W2,,W3,W4 wall WALL concrete (M30 ) 1st lift was completed (14-09-2018 )***** 20)SBR-W1 wall wall WEST side WALL concrete (M30 ) 4th lift was completed (15-09-2018 )***** 17)chlorine contact tank- PCC- for -raft-was completed-18-09-2018) *********** C)ELUR -SAAP-16-20-5MLD STP. and UGD DWC-HDPE -pipes Inspection done today (18-09-2018) along with PHED-AE, PHED/QC -AE- and Dy. EE at TIME TECHNOPLAST LTD-RR dist 501401-HYD &&&&&&&&&& 20)SBR-W1 wall wall WEST side WALL concrete (M30 ) 4th lift was completed (15-09-2018 )***** 22)chlorine contact tank- RCC- for -raft--steel & shuttering under progress ) *********** 23)Chlorination Building earth work excavation under progress=== 24)Inlet work earth work excavation is under progress.. 25)UGD-Brick Manholes is under progress (2+5nos completed ).(started-11-10-2018) 25a)EHD-35manhole covers arrived at site dated (07/10/2018)********************** 26)DWC-pipes arrived at site 8850Rmt ( 150dia-7704Rmt+200dia-486Rmt+300dia-660Rmt )Dated:04/10/2018************ 27)DWC-150dia pipe laying completed -16Rmt completed.(15/10/2018) 28)CCT- Ist lift wall 50% completed.(dated-15/10/2018) 29)SBR-W1east side 4th lift wall completed (17/10/2018 )*** 30)SBR-W1east side 5th lift wall copleted (18/10/2018)***** 31) Inlet work steel reinforcement work for footings under progress---- 32)Sludge thinker earth work under progress----- 33)Wet well Earth work excavation under progress ( Dated:03-11-2018 ) 34) centrifuge RCC for raft completed (17-11-2018)******* 35) Wet well steel reinforcement AND also well sinking going on************

Project In-Charge Official Details

Name: Mr. R. Subba Rao
Designation: Executive Engineer
Email: eluru_publichealth@yahoo.co.in
Phone: +91 8897368181

Project Components

News & Updates
  • 7th SHPSC Minutes of Meeting held on 10.05.2017

    Download

  • 6th State Level Technical Committee (SLTC) Minutes of Meeting held on 08.05.2017

    Download

  • 6th SHPSC Minutes of Meeting (MoM) under AMRUT

    Download

  • 5th SHPSC Minutes of Meeting (MoM) under AMRUT

    Download

  • 5th State Level Technical Committee (SLTC) Minutes of Meeting (MoM) held on 23.03.2017 under AMRUT

    Download

  • 3rd State Level Technical Committee (SLTC) Minutes of Meeting (MoM) held on 06.01.2017 under AMRUT

    Download

  • 2nd State Level Technical Committee (SLTC) Minutes of Meeting (MoM) under AMRUT

    Download

  • Minutes of 12th Meeting of Apex Committee under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) regarding.

    Download

  • SAAP 2016-17 Documents

    State Annual Action Plan (SAAP) (FY 2016-17) Andhra PradeshDownload