Name of the Project
Providing Water Supply House Service Connections, Distribution Lines and Reservoirs (Elevated/GL) wherever source is available in Tirupati Municipal Corporation under AMRUT Scheme
Name of the Agency
M/s.Velko Infratek Projects Pvt., Ltd., Vijayawada
SAAP Approval Meeting No. & Date by SHPSC SAAP Approved Cost
(In Cr.)
Technical Approval Date of DPR by SLTC Administrative Approval of DPR by SHPSC NIT Approved Administrative Sanction Cost (In Cr.)
1
21/09/2015
77.50 11/02/2016 24/03/2016 23/08/2016
Tender Floated On Last Date of receipt of Tender Tender Type IBM / ECV Value % of Tender
Yes 13/09/2016 EPC 93.70 -1.890
Contract Awarded Cost
(In Cr.)
Contract Awarded On Contract Period (Months) Completion Date Remarks
78.40 13/02/2017 24 12/02/2019 1) Pumping/Gravity Main- I. 400mm DI K7 pipe – Scope 1210 m Supply 1210 m and laying 1165 m, Hydro testing – 0 m II. 500mm DI K7 pipe – Scope 2490 m Supply 2490 m and laying 2119.5 m, Hydro testing – 800 m III. 600 mm dia K9 pipes – Scope 100 Supply 100 m Laying 0 m, Hydro testing – 0 m IV. 600 mm dia K7 pipes – Scope 9960 m Supply 9958.5 m and Laying 7334 m, Hydro testing – 1800 m 2) ELBR- I. WTP Mangalam ELBR (500 KL) – 9th lift wall is in progress 3) Feeder Main- I. 200mm DI K7 pipe – Scope 2060 m Supply 2057 m and laying 1195.5 m, Hydrotesting – 0 m II. 250mm DI K7 pipe – Scope 500 m Supply 472.5 m and laying 397.5 m, Hydro testing – 0 m III. 350 mm DI K9 pipe- Scope 1540 m Supply 1539 m and laying 358.00 m, Hydro testing – 0 m IV. 400mm DI K9 pipe – Scope 1390 m Supply 138 m and laying 0 m, Hydro testing – 0 m 4) ELSR 11 no’s- I. Mahila University ELSR (1500 KL) - Concrete work for columns completed up to 11.05 m II. Padmavathi Park ELSR (1500 KL) - Concrete work for top doom slab completed III. Auto Nagar-2 ELSR (600 KL) near UDS office - Concrete work for top doom slab completed IV. Rajeev Nagar ELSR (1350 KL) –Shuttering work for top doom slab is in progress V. Lakshmi Puram-2 (1000 KL)- Bottom dome slab shuttering work is in progress VI. Auto Nagar-1 ELSR (1000 KL) – Bottom dome slab shuttering work is in progress VII. Prakasham Park ELSR (1700 KL) - Concrete work for top doom slab completed VIII. Bhupal Housing Colony ELSR (1000 KL) - Concrete work for top doom slab completed IX. Lakshmi Puram-1(1000 KL) - Concrete work for columns completed up to 7.55 m X. NGO colony ELSR (1800 KL) –Concrete work for Bottom dome slab completed XI. SPJNM School ELSR (1150 KL) - Concrete work for top doom slab completed XII. Railway colony ELSR (2000 KL)-Till ground level work completed 5) Distribution network- I. 110 mm dia HDPE pipe – Scope 105523 m Supply 65604 m and laying 60860 m, Hydrotesting – 33926 m II. 160 mm dia HDPE pipe - Scope 19267 m Supply 14504 m and laying 12643 m, Hydrotesting – 9643 m III. 200 mm dia HDPE pipe - Scope 2000 m Supply 2000 m and laying 1714 m, Hydrotesting – 1527 m IV. 250 mm dia HDPE pipe - Scope 10215 m Supply 5463 m and laying 3126 m, Hydrotesting – 2358 m V. 315 mm dia HDPE pipe - Scope 648 m Supply 648 m and laying 600 m, Hydrotesting – 580 m 6) House Service Connections I. HSC –Scope 19464 No’s-Procured 9962 No’s -HSC completed -6922No’s (Replaced) II. HSC –Scope 5862 No’s-Procured 2931 No’s -HSC completed -24No’s (New Connections) 7) Payment-Work done till date by the contractor Rs.55 Cr-Released till date to the contractor-Rs.38.10 Cr 8) Issues- I. Contractor not maintaining registers like site order book, concreting register and stock registers of materialsetc. II. Mobilization of more man power is needed for pipe laying and HSC works

Project In-Charge Official Details

Name: Mr. E. Sudhakara Rao
Designation: Superintendent Engineer, Muncipal Corporation
Email: sesudhakaramct@gmail.com
Phone: 9866078107

Project Components

News & Updates
  • 7th SHPSC Minutes of Meeting held on 10.05.2017

    Download

  • 6th State Level Technical Committee (SLTC) Minutes of Meeting held on 08.05.2017

    Download

  • 6th SHPSC Minutes of Meeting (MoM) under AMRUT

    Download

  • 5th SHPSC Minutes of Meeting (MoM) under AMRUT

    Download

  • 5th State Level Technical Committee (SLTC) Minutes of Meeting (MoM) held on 23.03.2017 under AMRUT

    Download

  • 3rd State Level Technical Committee (SLTC) Minutes of Meeting (MoM) held on 06.01.2017 under AMRUT

    Download

  • 2nd State Level Technical Committee (SLTC) Minutes of Meeting (MoM) under AMRUT

    Download

  • Minutes of 12th Meeting of Apex Committee under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) regarding.

    Download

  • SAAP 2016-17 Documents

    State Annual Action Plan (SAAP) (FY 2016-17) Andhra PradeshDownload