SAAP 2015-16 Tirupathi

Name of the Project
Providing Water Supply House Service Connections, Distribution Lines and Reservoirs (Elevated/GL) wherever source is available in Tirupati Municipal Corporation under AMRUT Scheme
Name of the Agency
M/s.Velko Infratek Projects Pvt., Ltd., Vijayawada
SAAP Approval Meeting No. & Date by SHPSC SAAP Approved Cost
(In Cr.)
Technical Approval Date of DPR by SLTC Administrative Approval of DPR by SHPSC NIT Approved Administrative Sanction Cost (In Cr.)
1
21/09/2015
77.50 11/02/2016 24/03/2016 23/08/2016
Tender Floated On Last Date of receipt of Tender Tender Type IBM / ECV Value % of Tender
Yes 13/09/2016 EPC 93.70 -1.890
Contract Awarded Cost
(In Cr.)
Contract Awarded On Contract Period (Months) Completion Date Remarks
78.40 13/02/2017 24 12/02/2019 1) Pumping/Gravity Main- I. 400mm DI K7 pipe – Scope 1210 m Supply 1210 m and laying 1165 m, Hydro testing – 0 m II. 500mm DI K7 pipe – Scope 2490 m Supply 2490 m and laying 2119.5 m, Hydro testing – 800 m III. 600 mm dia K9 pipes – Scope 100 Supply 100 m Laying 0 m, Hydro testing – 0 m IV. 600 mm dia K7 pipes – Scope 9960 m Supply 9958.5 m and Laying 7070 m, Hydro testing – 1800 m 2) ELBR- I. WTP Mangalam ELBR (500 KL) – Slip form is in progress 3) Feeder Main- I. 200mm DI K7 pipe – Scope 2060 m Supply 2057 m and laying 1178.5 m, Hydro testing – 0 m II. 250mm DI K7 pipe – Scope 500 m Supply 472.5 m and laying 397.5 m, Hydro testing – 0 m III. 350 mm DI K9 pipe- Scope 1540 m Supply 1539 m and laying 358.00 m, Hydro testing – 0 m IV. 400mm DI K9 pipe – Scope 1390 m Supply 138 m and laying 0 m, Hydro testing – 0 m 4) ELSR 11 no’s- I. Mahila University ELSR (1500 KL) - Concrete work for columns completed up to 7.56 m II. Padmavathi Park ELSR (1500 KL) - Concrete work for top doom slab completed III. Auto Nagar-2 ELSR (600 KL) near UDS office - Concrete work for top doom slab completed IV. Rajeev Nagar ELSR (1350 KL) – Shuttering work for top doom slab is in progress V. Lakshmi Puram-2 (1000 KL)- Bottom dome slab shuttering work is in progress VI. Auto Nagar-1 ELSR (1000 KL) – Bottom dome slab shuttering work is in progress VII. Prakasham Park ELSR (1700 KL) - Concrete work for top doom slab completed VIII. Bhupal Housing Colony ELSR (1000 KL) - Concrete work for top doom slab completed IX. Lakshmi Puram-1(1000 KL) - Concrete work for columns completed up to 6.955 m X. NGO colony ELSR (1800 KL) – Concrete work for Bottom dome slab completed XI. SPJNM School ELSR (1150 KL) - Concrete work for top doom slab completed XII. Railway colony ELSR (2000 KL)-Annular Raft completed 5) Distribution network- I. 110 mm dia HDPE pipe – Scope 105523 m Supply 60600 m and laying 60300 m, Hydro testing – 24926 m II. 160 mm dia HDPE pipe - Scope 19267 m Supply 14570 m and laying 11187 m, Hydro testing – 7293 m III. 200 mm dia HDPE pipe - Scope 2000 m Supply 2000 m and laying 1714 m, Hydro testing – 1527 m IV. 250 mm dia HDPE pipe - Scope 10215 m Supply 5467 m and laying 2816 m, Hydro testing – 1255 m V. 315 mm dia HDPE pipe - Scope 648 m Supply 648 m and laying 600 m, Hydro testing – 580 m 6) House Service Connections I. HSC –Scope 19464 No’s-Procured 9962 No’s -HSC completed -6310 No’s (Replaced) II. HSC –Scope 5862 No’s-Procured 2931 No’s -HSC completed -24 No’s (New Connections) 7) Payment- Work done till date by the contractor Rs.51 Cr-Released till date to the contractor-Rs.38.10 Cr 8) Issues- I. QAP not yet submitted by the contractor for materials which are using at site II. Contractor not maintaining registers like site order book and concrete register etc.

Project In-Charge Official Details

Name: Mr. E. Sudhakara Rao
Designation: Superintendent Engineer, Muncipal Corporation
Email: sesudhakaramct@gmail.com
Phone: 9866078107

Project Components

News & Updates
  • 7th SHPSC Minutes of Meeting held on 10.05.2017

    Download

  • 6th State Level Technical Committee (SLTC) Minutes of Meeting held on 08.05.2017

    Download

  • 6th SHPSC Minutes of Meeting (MoM) under AMRUT

    Download

  • 5th SHPSC Minutes of Meeting (MoM) under AMRUT

    Download

  • 5th State Level Technical Committee (SLTC) Minutes of Meeting (MoM) held on 23.03.2017 under AMRUT

    Download

  • 3rd State Level Technical Committee (SLTC) Minutes of Meeting (MoM) held on 06.01.2017 under AMRUT

    Download

  • 2nd State Level Technical Committee (SLTC) Minutes of Meeting (MoM) under AMRUT

    Download

  • Minutes of 12th Meeting of Apex Committee under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) regarding.

    Download

  • SAAP 2016-17 Documents

    State Annual Action Plan (SAAP) (FY 2016-17) Andhra PradeshDownload