Government of Andhra Pradesh Government of
Andhra Pradesh, India
Andhra Pradesh Urban Finance and Infrastructure Development Corporation (APUFIDC) Andhra Pradesh Urban Finance and
Infrastructure Development Corporation
Municipal Administration & Urban Development (MA & UD)

SAAP 2016-20 Tirupathi

Name of the Project
Providing Water supply House Service connections, Clear water transmission mains, distribution lines & Reservoirs wherever source is available in Tirupati Municipal Corporation under AMRUT (2016-20) Project.
Name of the Agency
NCC Limited, Hyderabad
SAAP Approval Meeting No. & Date by SHPSC SAAP Approved Cost
(In Cr.)
Technical Approval Date of DPR by SLTC Administrative Approval of DPR by SHPSC NIT Approved Administrative Sanction Cost (In Cr.)
6
15/03/2017
43.98 08/05/2017 10/05/2017 29/07/2017
Tender Floated On Last Date of receipt of Tender Tender Type IBM / ECV Value % of Tender
Yes 01/09/2017 EPC 49.07 4.750
Contract Awarded Cost
(In Cr.)
Contract Awarded On Contract Period (Months) Completion Date Remarks
51.40 12/11/2017 15 11/02/2019 1) Pumping/Gravity Main- I. 1100 mm dia MS pipe – Scope 8300 m Supply 4143 m and laying 0 m, Hydro testing – 0 m 2) Feeder Main – I. 250 mm diaDI K9 pipes – Scope 370 m Supply 368.50and Laying 0 m, Hydro testing – 0 m II. 300 mm diaDI K9 pipes – Scope 1200 m Supply 1199and Laying 0 m, Hydro testing – 0 m III. 400 mm diaDI K9 pipes – Scope 310 m Supply 310 and Laying 0 m, Hydro testing – 0 m 3) ELSR 3 no’s- I. Madhav Nagar ELSR (1000 KL) – Columns up to 2nd brace beam completed. II. Sriram Nagar Colony ELSR (750 KL) (Revised) –Columns up to GL completed. III. Medical Collage ELSR (1200 KL) –Excavation Completed. 4) Distribution network- I. 110 mm dia HDPE pipe – Scope 25225 m Supply 23718 m and laying12593.58 m, Hydrotesting – 3185.47 m II. 160 mm dia HDPE pipe - Scope 5347 m Supply 5191 m and laying 3080.90 m, Hydrotesting – 1229.5 m III. 200 mm dia HDPE pipe - Scope 1982 m Supply 1037 m and laying 565.36 m, Hydro testing – 76 m IV. 250 mm dia HDPE pipe - Scope 740 m Supply 625 m and laying 0 m, Hydrotesting – 0 m V. 300 mm dia DI K7 pipe - Scope 1075 m Supply 1072.5 m and laying 506 m, Hydrotesting–0 m VI. 400 mm dia DI K7 pipe - Scope 476 m Supply 474 m and laying 0 m, Hydrotesting – 0 m 5) House Service Connections I. HSC –Scope 5804 No’s-Procured 3300 No’s -HSC completed -0No’s 6) Payment released till date to the contractor-2.30 crores. i. 2nd RA Bill submitted for a value of 1.35 crores. ii. Work completed till date for a value of 10crores.

Project In-Charge Official Details

Name: Mr. E Sudhakara Rao
Designation: Superintendent Engineer, Muncipal Corporation Tiru
Email: sesudhakaramct@gmail.com
Phone: 9866078107

Project Components

News & Updates
  • 7th SHPSC Minutes of Meeting held on 10.05.2017

    Download

  • 6th State Level Technical Committee (SLTC) Minutes of Meeting held on 08.05.2017

    Download

  • 6th SHPSC Minutes of Meeting (MoM) under AMRUT

    Download

  • 5th SHPSC Minutes of Meeting (MoM) under AMRUT

    Download

  • 5th State Level Technical Committee (SLTC) Minutes of Meeting (MoM) held on 23.03.2017 under AMRUT

    Download

  • 3rd State Level Technical Committee (SLTC) Minutes of Meeting (MoM) held on 06.01.2017 under AMRUT

    Download

  • 2nd State Level Technical Committee (SLTC) Minutes of Meeting (MoM) under AMRUT

    Download

  • Minutes of 12th Meeting of Apex Committee under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) regarding.

    Download

  • SAAP 2016-17 Documents

    State Annual Action Plan (SAAP) (FY 2016-17) Andhra PradeshDownload