Government of Andhra Pradesh Government of
Andhra Pradesh, India
Andhra Pradesh Urban Finance and Infrastructure Development Corporation (APUFIDC) Andhra Pradesh Urban Finance and
Infrastructure Development Corporation
Municipal Administration & Urban Development (MA & UD)

SAAP 2016-20 Guntakul

Name of the Project
Providing pumping main from WTP to ELSR’s in the town including construction of pump house and supply of pump sets and construction of 2 No’s ELSR’s
Name of the Agency
M/s. KLSR Infrastructure Pvt. Limited.
SAAP Approval Meeting No. & Date by SHPSC SAAP Approved Cost
(In Cr.)
Technical Approval Date of DPR by SLTC Administrative Approval of DPR by SHPSC NIT Approved Administrative Sanction Cost (In Cr.)
6
15/03/2017
8.38 23/03/2017 01/05/2017 09/10/2017
Tender Floated On Last Date of receipt of Tender Tender Type IBM / ECV Value % of Tender
Yes 20/10/2017 Non-EPC 4.490
Contract Awarded Cost
(In Cr.)
Contract Awarded On Contract Period (Months) Completion Date Remarks
10.09 16/02/2018 12 15/02/2019 Letter of acceptance Date: 16-02-2018. Contract agreement Date: 05-05-2018, Target date of completion: 05-05-2019, (12 Months) EOT Submitted Date: 14-05-2019. EOT Approved Date: 26-09-2019. (6 Months) (EOT period completion: 04-11-2019) EOAT Submission Date: 13-11-2019. Components - 1) Construction of 7.4 X 6.9 m Pump House at Filtration Plant. Status: Drawings and designs is approved. Concrete work completed up to slab bottom and further work in progress. 2) Pump Sets - 3 no X 49 KW. Status: designs approved by the SE (PH) ATP office. DT: 06-02-2019. 3) DI K9 100 mm to 400 mm dia Transmission Line - 9.06 KM. Status: - Transmission pumping main Pipeline excavation stated Date: 29.10.2018. As per Agreement – 9.060 km. DI K9 - 400 mm dia - 1.640 km. DI K9 - 350 mm dia - 2.481 km. DI K9 - 250 mm dia – 0.050 km. DI K9 - 200 mm dia – 2.947 km. DI K9 - 150 mm dia – 1.040 km. DI K9 - 100 mm dia – 0.902 km. Procurement - 9.176 Km. DI K9 - 400 mm dia - 1.620 km, Laying - 1.284 km, Tested – 0.000 km. DI K9 - 350 mm dia - 2.478 km, Laying - 2.058 km, Tested – 0.000 km. DI K9 - 250 mm dia – 0.000 km, Laying - 0.000 km, Tested – 0.000 km. DI K9 - 200 mm dia – 3.007 km, Laying - 2.491 km, Tested – 0.000 km. DI K9 - 150 mm dia – 1.644.5 km, Laying - 1.012 km, Tested – 0.000 km. DI K9 - 100 mm dia – 0.423.5 km, Laying - 0.374 km, Tested – 0.000 km. Status: LS is approved. Total Pipeline Laying: 7.219 Km. Total Pipeline Testing: 0.000 Km. 4) ELSR s - 02 no's I) Boy's High School ELSR: Staircase - Concrete work completed up to 1st bracing beam. ELSR - Concrete work completed up to Columns 1st lift above 1st brace beam and work was stopped due to Contractor not mobilized for skilled workers for bar benders and shuttering workers. DT:16-11-2018. II) Gowtham Nagar ELSR Staircase - Concrete work completed up to 7th flight. ELSR - Concrete work completed up to dome ring beam bottom. Dome concrete completed. 5). Payments: 1. Value of work done (in cr) - 5.00 Cr's. 2. Value of bills submitted (in cr) - 3.46 Cr's. 3. Mobilization advance paid (if any) (in cr) - Nil 4. Value of bills paid (in cr) - 1.16 Cr's. 5. Cfms number for pending payment. 1. Amount Rs. 0.30 Cr's, CFMS No: 647787. 2. Amount Rs. 2.00 Cr's, CFMS not generated. 6). Quality Tests: No Quality Tests conducted this week. 7). ISSUES: 1. The Contractor was properly not maintained trench depths and Safety precautions, they not doing proper backfilling like compaction and levelling at the site. 2. Contractor not mobilized for skilled workers for bar benders and shuttering workers. 3. Hydrostatic test is not conducting the contracting agency and Road restoration work not doing the contracting agency. 4) R&B Road Permissions i). Permission was given by R&B department along Kasapuram road laying of pipeline At Km CH: 0/060 to 0/210, Km CH: 0/313 to 2/008 Total berm cutting for a Length of the road - 1845.00 mts. road cutting restoration charges pending at PH Department. Letter NO: 623/Road Cutting /TA/2018-19, Date: 29-11-2018. ii). Kasapuram Road pipeline crossing Permission given by R&B department, the BT road at Km CH: 1/318 for a length of 15.00 Mtr’s, road cutting restoration charges pending at PH Department. Letter NO: 623/Road Cutting /TA/2018-19, Date: 29-11-2018. Letter NO: 623/Road Cutting /TA/2018-19, Date: 29-11-2018. iii). Alur Road pipeline crossing permission given by R&B department, at Km CH: 1/8 for a length of 7.70 Mts road cutting restoration charges pending at PH Department. Letter NO: 624/Road Cutting /TA/2018-19, Date: 29-11-2018. 5) One - Railway area pipeline permission got, and another railway area permission got unofficially from railway dept. officially these two permissions are pending at the railway department. Railway Authorities do not permit the laying of 200mm dia DI pipe on existing ROBs near Railway station - letter - 12.02.2019 6. No work is progressing due to lack of funds and shortage of sand.

Project In-Charge Official Details

Name: Mr. Sri. S. Sathish Chandra Reddy
Designation: Executive Engineer
Email: eephatp@yahoo.co.in
Phone:

Project Components

News & Updates
  • 7th SHPSC Minutes of Meeting held on 10.05.2017

    Download

  • 6th State Level Technical Committee (SLTC) Minutes of Meeting held on 08.05.2017

    Download

  • 6th SHPSC Minutes of Meeting (MoM) under AMRUT

    Download

  • 5th SHPSC Minutes of Meeting (MoM) under AMRUT

    Download

  • 5th State Level Technical Committee (SLTC) Minutes of Meeting (MoM) held on 23.03.2017 under AMRUT

    Download

  • 3rd State Level Technical Committee (SLTC) Minutes of Meeting (MoM) held on 06.01.2017 under AMRUT

    Download

  • 2nd State Level Technical Committee (SLTC) Minutes of Meeting (MoM) under AMRUT

    Download

  • Minutes of 12th Meeting of Apex Committee under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) regarding.

    Download

  • SAAP 2016-17 Documents

    State Annual Action Plan (SAAP) (FY 2016-17) Andhra PradeshDownload