SAAP 2016-20 Adoni

Name of the Project
RAW WATER PUMPING MAIN (5.5 KM) TO RAMJALA WATER BODY, CONSTRUCTION OF 8 MLD WTP & 7 MLD WTP, CONSTRUCTION OF ELSR’S - 2 NUMBERS
Name of the Agency
M/s. Indian Hume Pipe Company Ltd., Mumbai.
SAAP Approval Meeting No. & Date by SHPSC SAAP Approved Cost
(In Cr.)
Technical Approval Date of DPR by SLTC Administrative Approval of DPR by SHPSC NIT Approved Administrative Sanction Cost (In Cr.)
6
15/03/2017
16.00 23/03/2017 01/05/2017 18/07/2017
Tender Floated On Last Date of receipt of Tender Tender Type IBM / ECV Value % of Tender
Yes 04/08/2017 EPC 21.63 4.480
Contract Awarded Cost
(In Cr.)
Contract Awarded On Contract Period (Months) Completion Date Remarks
22.60 24/11/2017 15 23/02/2019 1)G.O. No. 386 issued on 06.11.2017. 2) Survey completed on 08.12.2017. 3) Soil investigation completed on 12.12.2017. 4) Hydraulic designs submit through mail on 17.01.2018 5) ELSR Structural Designs submit through mail on 19.01.2018. 6) Joint inspection with Ph QC EE, Ph AE at srikalahasthi pipes factory for 600mm DI pipe line on 25.01.2018. 7) Inspected 600mm DI K9 pipes received 396mts to basapuram on 28.01.2018. 8) 600mm DI K9 pipes received 648mts to basapuram on 29.01.2018. 9) 600mm DI K9 pipes received 660mts to basapuram on 30.01.2018. 10) 600mm DI K9 pipes received 264mts to basapuram on 31.01.2018. total received 1967 mts. 11)As per Ph SE & DEE sir instruction, contractor take 5 soil sample at basapuram to ramjala raw water transmission pipe lines to send lad and to know characteristics of soil due to corrosions on old DI pipes on 02.02.2018. 12) ELSR's structural designs approved. 13) LS of 600mm & 300mm DI pipes for raw water transmission approved. 14)On 12.03.2018 Work started at ramjala to yemmiganuru road Pipe line 300mm DI K7 & 1000KL ELSR excavation started at ramjala, 15) On 16.03.2018 earth excavation completed at Ramjala for 1000KL ELSR, 16) Earth work starts at raitu bazar for 1000KL ELSR construction on 23.03.2018. 17)Excavating & laying 300mm DI K7 pipe line- 680 mts completed at ramjala, 18)WTP structural designs yet to be submit.

Project In-Charge Official Details

Name: Mr. K. Viswanath
Designation: Municipal Engineer
Email: adnmplty@rediffmail.com
Phone: 9849906650

Project Components

News & Updates
  • 7th SHPSC Minutes of Meeting held on 10.05.2017

    Download

  • 6th State Level Technical Committee (SLTC) Minutes of Meeting held on 08.05.2017

    Download

  • 6th SHPSC Minutes of Meeting (MoM) under AMRUT

    Download

  • 5th SHPSC Minutes of Meeting (MoM) under AMRUT

    Download

  • 5th State Level Technical Committee (SLTC) Minutes of Meeting (MoM) held on 23.03.2017 under AMRUT

    Download

  • 3rd State Level Technical Committee (SLTC) Minutes of Meeting (MoM) held on 06.01.2017 under AMRUT

    Download

  • 2nd State Level Technical Committee (SLTC) Minutes of Meeting (MoM) under AMRUT

    Download

  • Minutes of 12th Meeting of Apex Committee under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) regarding.

    Download

  • SAAP 2016-17 Documents

    State Annual Action Plan (SAAP) (FY 2016-17) Andhra PradeshDownload