Name of the Project
INTAKE/PUMP HOUSE AT MYLAVARAM RESERVOIR BY PUMPING AND TRANSMISSION MAIN FROM MYLAVARAM RESERVOIR TO GLBR (250 mts), GLBR TO ELBR (29450 mts) AT RAMESWARAM WATER HEAD WORKS BY GRAVITY, WATER TREATMENT TANK -43 MLD, CWPS, FEEDER MAIN.
Name of the Agency
M/s.MEGHA Engineering & Infrastructure Ltd.
SAAP Approval Meeting No. & Date by SHPSC SAAP Approved Cost
(In Cr.)
Technical Approval Date of DPR by SLTC Administrative Approval of DPR by SHPSC NIT Approved Administrative Sanction Cost (In Cr.)
6
15/03/2017
115.46 08/05/2017 10/05/2017 17/06/2017
Tender Floated On Last Date of receipt of Tender Tender Type IBM / ECV Value % of Tender
Yes 20/07/2017 EPC 113.43 4.400
Contract Awarded Cost
(In Cr.)
Contract Awarded On Contract Period (Months) Completion Date Remarks
118.40 24/11/2017 15 23/02/2019 Agreement Concluded on 28.12.2017 PRODDATUR -AMRUT SAAP 2106-2020 Intake well & GLBR : Designs not received yet WTP & ELBR : Soil sample taken on 05.01.2018.Designs yet to prepare.Site handover pending. Forest department permissions for clearing of trees . APSPDL Shifting of Electrical line & Transformers . ELSR 1 : Site changed due to Chairperson instructions on 20.01.2018 . Site changed from Bollavaram to Hanuman Nagar - Soil sample taken on 13.02.2018.Site handover pending. ELSR 2 : Site changed from Modempalle to Bharat function hall back side site , Yerraguntla road. While on jungle Clarence deadbodies came ..Work stopped and site changed from Bharat function hall back side to Veterinary hospital site...Site handover pending. ELSR 3 : Site changed from Rameswaram to Municipal park ..Soil sample is taken for lab reports.Site handover pending. Soil sample collection completed at ELSR -1 Municipal Park, ELSR -2 ARTS College, ELSR -3 Veterinary Hospital by Sri Venkateswara University,Tirupathi. Lab report is pending. ELSR-2 : ARTS college site handover is pending, ELSR-3: Veternaty Hospital site handover is in progress. On 26.02.2018 Letter addressed to Managing Director, State veterinary department from Proddatur municipality for asking permission to construct ELSR on Veterinary department site. Level Section ,WTP, Intake Well Hydraulic drawings sent to SE(PH) by contractor .Waiting for structural drawings. On 06.03.2018 Permissions received from AE (APSPCDL) for shifting if Electrical lines,Transformers at Rameswaram Head Water Works,Proddatur. WTP,SBC reports received from Pullareddy Engineering College,Kurnool WTP Structural drawings submitted to SE (PH),Anantapur SE(PH) sir suggested some changes (level Section) in WTP to Contractor MEGHA Engineering & Infrastructure Ltd,Structural drawings for ELBR,Pump house is pending. After making corrections WTP Structural drawings submitted 2nd time to SE (PH),Anantapur. Municipal Park ELSR site handling over document with site plan submitted from Proddatur Municipality to Executive Engineer,Kadapa Water supply pipeline Railway crossing application is at South Central Railway division office,Secundrabad Corrections for Level Section drawings approved by SE (PH) , Anantapur WTP structural drawings Scrutining is ongoing at Se (PH) office ,Anantapur ELSR's Structural drawings submitted & Scrutining is ongoing at SE (PH),Anantapur "Soil sample collection completed for WTP,Pumphouse,Calriflocator,GLBR,Filtration wells by Sri Venkateswara University,Tirupathi." On 24.03.2018 Survey work started for feeder main from Rameswaram water head works to ELSR's, Locations (Gandhi municipal park,Arts college,Veterinary college, Nadimpalle, Old market),Feeder main survey completed, Levels & Length submition to SE (PH),Anantapur is pending For Intake well,GLBR,Pipeline along the North canal permissions approved by Irrigation dept,Under taking letter from PH dept (or) Contractor (for total project completion period) to Irrigation dept is pending DI pipe QAP approved by SE(PH), Anantapur and hard copy forwarded to EE (PH) ,Kadapa & Megha Engineering & Infrastructure Ltd . Undertaking letter submitted for (Irrigation land at Mylavaram for GLBR,Intake well & Pipe line along Mylavaram north canal ) irrigation dept properties from Megha Engineering & Infrastructure Ltd to DyEE (PH), Proddatur and forwarded it from DyEE to EE Irrigation dept,Kadapa For ELSR-3 at veterinary hospital site, land approval letter received from Director of animal husbandry,Vijayawada WTP, ELSR's, ELBR, GLBR, Intake Well Structural drawings & Designs not approved yet by SE(PH). ELSR's (3 No's) Structural Drawings & Designs approved by SE(PH), Anantapur . Requesting letter with Sketch for land handing over forwarded from Municipal Commissioner to Director of Animal Husbandry department, Vijayawada. ELSR's (3 No's) Structural Drawings & Designs received to DyEE (PH), Proddatur . Steel procured for ELSR-3 at Municipal park JSW neo FE 500D 10 mm,16 mm.Waiting for steel lab test reports. On 25.04.2018 water supply scheme 2016-20 Bhoomi pooja completed at ELSR-3 at municipal park site Proddatur in the presence of Chairperson Sir,Commissioner sir,Ward councilor ,DyEE(PH), AEE , AE, CMMU Staff Excavation work started at ELSR-3 at municipal park site Proddatur Work stopped in municipal park ELSR due to political involvement Waiting for Veterinary hospital site ,Irrigation Dept site, RDC nandyala permissions Waiting for WTP,Intake well structural drawings approval from SE(PH), Anantapur QAP industrial inspection finalized for DI K7 900 dia pipes on 07.05.2018 to Srikalahasti Pipes Ltd at Rachagunneri village,srikalahasti mandal,Chittoor District, Andhra pradesh. QAP for DI specials submitted to SE(PH),Anantapur On 07.05.2018 QAP industrial inspection completed along with EE(QC), DyEE(PH), AEE(QC), Megha engineers for the quantity 1998 mts (333 No's) of DI K7 900 dia pipes at Srikalahasti pipes ltd. Mix designs(Penna Cement M15, M20, M25, M30 - Ramco Cement M15, M20, M25, M30 - Coramandal cenemt M30 - Dalmia M30) , Sieve analysis submitted for approval to SE(PH) QAP industrial inspection finalized for DI Specials on 16.05.2018 to Electrosteel Castings Ltd at Kolkata DI K7 900 dia pipes unloading going at railway station road ,near by rameswaram water head works 1998 mts (333 No's) On 16-05-2018 Industrial inspection completed along with DyEE (PH),AEE (QC) for DI K(12 &13) 900 dia fittings 30 no's (Bends-11.25°,21.5°,45°,90°,Collars,Flanges) at Electrosteel Castings Ltd, Kolkata. Excavation work completed at ELSR-3 at municipal park site Proddatur ,Dressing work & Sand bedding work is going on. Shuttering work satarted for PCC at Municipal park site,Proddatur PCC work completed for ELSR-3 at Municipal park site,Proddatur Bar bending work started for foundation annular raft ELSR-3 at Municipal park site,Proddatur Column marking work started for foundation annular raft ELSR-3 at Municipal park site,Proddatur Reinforcement work started for foundation annular raft ELSR-3 at Municipal park site,Proddatur QAP industrial inspection 2nd time finalized for DI Specials (39 No's) on 19.06.2018 to Electrosteel Castings Ltd at Kolkata

Project In-Charge Official Details

Name: Mr. Chennakeshava Reddy
Designation: Executive Engineer (Public Health)
Email: eephkdp2007@gmail.com
Phone: +91 9949093755

Project Components

News & Updates
  • 7th SHPSC Minutes of Meeting held on 10.05.2017

    Download

  • 6th State Level Technical Committee (SLTC) Minutes of Meeting held on 08.05.2017

    Download

  • 6th SHPSC Minutes of Meeting (MoM) under AMRUT

    Download

  • 5th SHPSC Minutes of Meeting (MoM) under AMRUT

    Download

  • 5th State Level Technical Committee (SLTC) Minutes of Meeting (MoM) held on 23.03.2017 under AMRUT

    Download

  • 3rd State Level Technical Committee (SLTC) Minutes of Meeting (MoM) held on 06.01.2017 under AMRUT

    Download

  • 2nd State Level Technical Committee (SLTC) Minutes of Meeting (MoM) under AMRUT

    Download

  • Minutes of 12th Meeting of Apex Committee under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) regarding.

    Download

  • SAAP 2016-17 Documents

    State Annual Action Plan (SAAP) (FY 2016-17) Andhra PradeshDownload