Government of Andhra Pradesh Government of
Andhra Pradesh, India
Andhra Pradesh Urban Finance and Infrastructure Development Corporation (APUFIDC) Andhra Pradesh Urban Finance and
Infrastructure Development Corporation
Municipal Administration & Urban Development (MA & UD)

SAAP 2015-16 Adoni

Name of the Project
Providing House Service Connections & Distribution Lines wherever Reservoirs & Source is available
Name of the Agency
GPR Infra
SAAP Approval Meeting No. & Date by SHPSC SAAP Approved Cost
(In Cr.)
Technical Approval Date of DPR by SLTC Administrative Approval of DPR by SHPSC NIT Approved Administrative Sanction Cost (In Cr.)
1
21/09/2015
10.30 11/02/2016 24/03/2016 01/10/2016
Tender Floated On Last Date of receipt of Tender Tender Type IBM / ECV Value % of Tender
Yes 15/10/2016 EPC 10.11 4.590
Contract Awarded Cost
(In Cr.)
Contract Awarded On Contract Period (Months) Completion Date Remarks
10.57 20/09/2017 18 19/03/2019 1) Preliminary survey started on 10.11.2017 and completed on 23.11.2017. 2) Notice issued by ULB to Contractor for slow progress on 18.12.2017. 3) 2nd notice issued by ULB to contractor to speedy progress of work on 11.01.2018. 4) Designs submitted & taken approval from ULB on 25.01.2018, designs submit to Ph S.E for final Approval. 5) Correction designs submitted & taken approval from ULB on 14.02.2018, designs submit to Ph S.E for final approval. 6) Received QAP of HDPE pipes, fittings, valves & HSC for approval. 7) QAP of HDPE pipes, fittings, valves & HSC got approved waiting for inspection. 8) Joint inspection completed on 08.03.2018 along with ULB ME, DEE's at Maruti tubes pipes factory on 110mm PN6- 17000 mts, 160mm PN6 - 2500 mts, 200mm PN6- 2000 mts & 250mm PN6 - 2000 mts HDPE pipeline & fittings. 9) Joint inspection completed on 14.03.2018 along with ULB ME, DEE for HSC- 1/2''- 1800 Nos at Kimplas factory, Nashik. 10)Joint inspection completed on 15.03.2018 along with ULB ME, DEE for Air valves 80mm - 15Nos & sluice valves 100mm - 68 nos, 150mm - 25 nos, 200mm - 20, 250mm - 16 nos at Mayur valves factory, Nashik. 11)HDPE pipes 110mm PN6- 17000 mts, 160mm PN6 - 2500 mts, 200mm PN6- 2000 mts & 250mm PN6 - 2000 mts, total - 23.5 KMS out of 75.765KM & fittings received to site.

Project In-Charge Official Details

Name: Mr. K. Vishwanath
Designation: Municipal Executive Engineer
Email: adnmplty@rediffmail.com
Phone: 9849906650

Project Components

News & Updates
  • 7th SHPSC Minutes of Meeting held on 10.05.2017

    Download

  • 6th State Level Technical Committee (SLTC) Minutes of Meeting held on 08.05.2017

    Download

  • 6th SHPSC Minutes of Meeting (MoM) under AMRUT

    Download

  • 5th SHPSC Minutes of Meeting (MoM) under AMRUT

    Download

  • 5th State Level Technical Committee (SLTC) Minutes of Meeting (MoM) held on 23.03.2017 under AMRUT

    Download

  • 3rd State Level Technical Committee (SLTC) Minutes of Meeting (MoM) held on 06.01.2017 under AMRUT

    Download

  • 2nd State Level Technical Committee (SLTC) Minutes of Meeting (MoM) under AMRUT

    Download

  • Minutes of 12th Meeting of Apex Committee under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) regarding.

    Download

  • SAAP 2016-17 Documents

    State Annual Action Plan (SAAP) (FY 2016-17) Andhra PradeshDownload